30 MW MOBILE – FT8® MOBILEPAC® GAS TURBINE PACKAGE

The MOBILEPAC® gas turbine package is the industry leader in providing state of the art technology with over 30 years of experience. After many successful years of operation, the MOBILEPAC® gas turbine package now utilizes the FT8® engine and offers 30 megawatts of movable power. Utilizing the proven SWIFTPAC® gas turbine package technology, this package is designed to provide quick, reliable power and is especially useful in emergency situations. The MOBILEPAC® gas turbine package design includes two trailers. The first contains the gas turbine, electric generator, exhaust collector, diffuser and engine lube oil system. The second trailer carries the 15 kilovolts switchgear, control system, operation panel, protective relays, batteries and charger, motor control center and the hydraulic start package. A pre-commissioned MOBILEPAC® gas turbine package can be driven to a site and begin generating power in less than one day.

Benefits

  • Ready for emergency power within one day (site ready and previously commissioned)
  • Environmentally compatible
  • Dual fuel/dual frequency
  • Optional black start capability
  • Flexible trailer sighting
  • Highway compatible
  • Three-point support and structural rigidity to maintain generator alignment
  • Remote operation

Product Facts

  • Output (kW): 30,000
  • Base engine: FT8®
  • Number of Trailers: Two
  • Installation: One day (site ready and previously commissioned)
  • Noise: 95 dba at one meter
  • NOx/CO: 50/100 mg/m3
  • Grid: 50 or 60 Hz
  • Fuel: Liquid or Gas

Power Trailer

Gas Turbine Package

  • Gas generator (GG8-3 core engine)
  • Power turbine
  • Diffuser
  • Collector box
  • Exhaust transition
  • Fabricated gas turbine base and mount assembly
  • Coupling connecting power turbine and generator
  • Hydraulic starting motor
  • Ignition system
  • Off-line compressor internal water wash system
  • Lube oil system
  • Fuel supply system
  • Buffered air system
  • Water injection NOx control system
  • Gas turbine enclosure with three point jacking and leveling system
  • Two-stage inlet air filter with weather protection
  • Inlet silencing
  • Exhaust stack
  • Quick-disconnect electrical interface
  • Generator Package

  • Open-ventilated; air-cooled synchronous generator or equivalent
  • Brushless exciter assembly
  • Stator heaters
  • Neutral ground transformer/resistor
  • Current transformers
  • Stator RTDs
  • Vibration probes
  • Bearing drain RTDs
  • Bearing metal RTDs
  • Hot and cold air RTDs
  • Rotor ground detection
  • Generator lube oil system
  • Enclosure
  • Quick-disconnect electrical interface
  • Control Trailer

    Control Enclosure with HVAC

  • Operator control cabinet
  • Monitoring cabinet
  • Instrument cabinet
  • Unit control cabinet
  • Generator protective relay panel
  • Motor control center
  • Master terminal cabinet
  • Rack-mounted, sealed, lead, acid cell batteries
  • Battery chargers
  • Switchgear module 15 kV class
  • CTG auxiliary transformer
  • FM-200 fire suppression
  • Hydraulic Starting Package Field Installation Hardware

  • Interconnecting piping and hoses (CO2, fuel)
  • Interconnecting quick-disconnect electrical cables for power and signal
  • Access stairs and platforms for power trailer and control trailer
  • Piping interfaces
  • Special maintenance tools
  • Options Available

  • Equipment erection
  • Equipment demolition
  • Balance of plant (BOP) design, supply and install
  • Freight